1
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/14316 / Underground dark fiber leasing from MSEB, Kalwa to Vodafone dighe for the period of Three years | Fri, 07-Nov-2025 11:00 AM / Fri, 07-Nov-2025 11:30 AM
| Tue, 28-Oct-2025 11:45 AM |
View
| |
|
2
| Multi Locations | CC/T/W-AIS/DOM/A01/25/13865 / 765kV AIS New Substation Package SS 140T | Sat, 22-Nov-2025 11:55 PM / Mon, 24-Nov-2025 11:30 AM
| Mon, 27-Oct-2025 06:03 PM |
View
| |
|
3
| Andhra Pradesh | SR1/NT/W-AIS/DOM/B00/25/13182 / WC-4402 Supply and Erection works due to Re-Arrangement in Electrical Layout at Kurnool-III Pooling Station | Mon, 17-Nov-2025 11:00 AM / Mon, 17-Nov-2025 11:30 AM
| Mon, 27-Oct-2025 04:40 PM |
View
| |
|
4
| POWERGRID NAGPUR | WR1/T/W-MISC/DOM/F01/25/14083 / LAND SCHEDULING WORK OF VARIOUS TRANSMISSION SCHEME UNDER TBCB IN WR-I | Mon, 27-Oct-2025 02:45 PM / Wed, 05-Nov-2025 03:30 PM
| Mon, 27-Oct-2025 02:40 PM |
View
| |
|
5
| POWERGRID NAGPUR | WR1/NT/S-MISC/DOM/F01/25/13748 / THIRD PARTY PROTECTION AUDIT OF 05 NO SUBSTATIONS IN WR-I | Mon, 27-Oct-2025 02:40 PM / Mon, 10-Nov-2025 03:30 PM
| Mon, 27-Oct-2025 02:35 PM |
View
| |
|
6
| Bihar | ER2/NT/S-MISC/DOM/ZA4/25/14256 / Hiring dark fiber on lease from third party for last mile connectivity of NIC Darbhanga and NIC Supaul in Bihar | Thu, 06-Nov-2025 11:00 AM / Thu, 06-Nov-2025 11:30 AM
| Mon, 27-Oct-2025 10:10 AM |
View
| |
|
7
| VIZAG | SR2/NT/S-MISC/DOM/ZA1/25/14226 / GEM/2025/B/6822218 | Tue, 04-Nov-2025 06:00 PM / Tue, 04-Nov-2025 06:30 PM
| Fri, 24-Oct-2025 06:17 PM |
View
| |
|
8
| Malerkotla and Ludhiana | NR2/NT/S-MISC/DOM/J01/25/14199 / Manpower Assistance for various maintenance activities in the Substation OandM works at Malerkotla and Ludhiana for 2 years with provision for extension for 1 year CS-268(25) | Mon, 03-Nov-2025 04:00 PM / Mon, 03-Nov-2025 04:25 PM
| Fri, 24-Oct-2025 03:53 PM |
View
| |
|
9
| Changlang, Arunachal Pradesh | NER/NT/W-AIS/DOM/H03/25/13767 / Addition of one 33kV bay at the 33/11 kV Changlang Substation under the ARP-DMS-04 package under Comp. Scheme for Strengthening of Transmission and Distribution system in Arunachal Pradesh | Fri, 14-Nov-2025 11:00 AM / Fri, 14-Nov-2025 11:00 AM
| Fri, 24-Oct-2025 02:45 PM |
View
| |
|
10
| NR-I, NR-III and WR-I | NR3/NT/G-MISC/DOM/CP1/25/14183 / Supply, Installation and Retrofitting of DG sets for Northern Region-I, Northern Region-III and Western Region-I of POWERGRID | Mon, 10-Nov-2025 11:00 AM / Mon, 10-Nov-2025 11:30 AM
| Fri, 24-Oct-2025 10:30 AM |
View
| |
|
11
| Power Grid Corporation of India Ltd,765/400KV GIS Sub Station Village Khanivali , Vashind - Ambadi Road , Taluka Bhiwandi Distt Thane | WR1/NT/W-MISC/DOM/F01/25/12241 / Residential Quarters Padghe | Fri, 31-Oct-2025 05:00 PM / Tue, 04-Nov-2025 03:30 PM
| Fri, 24-Oct-2025 10:25 AM |
View
| |
|
12
| GURGAON | CC/NT/W-CIVIL/DOM/A15/25/14084 / Supply and Installation of 15 Passenger Machine Room Less Lift including required civil works at MP Hall of POWERGRID Gurgaon | Thu, 06-Nov-2025 11:00 AM / Mon, 10-Nov-2025 11:30 AM
| Thu, 23-Oct-2025 02:00 PM |
View
| |
|
13
| Tiruvalum and Pondicherry | SR2/NT/S-MISC/DOM/ZA1/25/14140 / leasing of last mile fibre for links in Tiruvalam and Puducherry for a period of 3 years | Mon, 03-Nov-2025 03:00 PM / Mon, 03-Nov-2025 03:30 PM
| Thu, 23-Oct-2025 12:05 PM |
View
| |
|
14
| Lucknow | NR3/NT/S-MISC/DOM/K00/25/13559 / Rectification works in Ballia-Lucknow-lucknow Jurisdiction | Fri, 07-Nov-2025 05:10 PM / Fri, 07-Nov-2025 05:10 PM
| Wed, 22-Oct-2025 04:45 PM |
View
| |
|
15
| Sohawal | NR3/NT/S-MISC/DOM/K00/25/13558 / Rectification works in Ballia-Lucknow- Sohawal Jurisdiction | Fri, 07-Nov-2025 05:05 PM / Fri, 07-Nov-2025 05:05 PM
| Wed, 22-Oct-2025 04:41 PM |
View
| |
|
16
| Azamgarh | NR3/NT/S-MISC/DOM/K00/25/13556 / Rectification works in Ballia-Lucknow- Azamgarh Jurisdiction | Fri, 07-Nov-2025 05:00 PM / Fri, 07-Nov-2025 05:00 PM
| Wed, 22-Oct-2025 04:35 PM |
View
| |
|
17
| Ballia | NR3/NT/S-MISC/DOM/K00/25/13555 / Rectification works in Ballia-Lucknow- Ballia Jurisdiction | Fri, 07-Nov-2025 04:55 PM / Fri, 07-Nov-2025 04:55 PM
| Wed, 22-Oct-2025 04:30 PM |
View
| |
|
18
| Ballia Lucknow TL | NR3/NT/S-MISC/DOM/K00/25/13444 / REPLACEMENT OF INSULATORS | Fri, 07-Nov-2025 04:20 PM / Fri, 07-Nov-2025 04:25 PM
| Wed, 22-Oct-2025 04:20 PM |
View
| |
|
19
| Power Grid Lucknow | NR3/NT/G-MISC/DOM/K00/25/14098 / Deployment of highly skilled manpower for attending defects in EHV transmission lines under NR3 of POWERGRID during shutdown for diversion works/ defect rectification in summer season/ insulator cleaning work in winter season | Sat, 01-Nov-2025 11:00 AM / Sat, 01-Nov-2025 04:16 PM
| Wed, 22-Oct-2025 04:16 PM |
View
| |
|
20
| allahabaad | NR3/NT/G-MISC/DOM/K00/25/14094 / Supply of Godrej make furniture for Field Hostel at POWERGRID township at Chaufatka, Prayagraj | Sat, 25-Oct-2025 11:00 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 04:10 PM |
View
| |
|
21
| Prayagraj | NR3/NT/G-MISC/DOM/K00/25/14092 / Supply of Godrej make furniture for Field Hostel at POWERGRID township at Chaufatka, Prayagraj | Sat, 25-Oct-2025 11:30 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 04:06 PM |
View
| |
|
22
| Varanasi | NR3/NT/G-MISC/DOM/K00/25/14096 / Supply of Godrej make Furniture items at J P Mehta Nagar Nigam Inter College, Varanasi (Uttar Pradesh) under CSR initiative of POWERGRID through GeM | Sat, 25-Oct-2025 11:00 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 03:39 PM |
View
| |
|
23
| Varanasi | NR3/NT/G-MISC/DOM/K00/25/14095 / Supply of Godrej make Furniture items at J P Mehta Nagar Nigam Inter College, Varanasi (Uttar Pradesh) under CSR initiative of POWERGRID through GeM | Sat, 25-Oct-2025 11:30 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 03:28 PM |
View
| |
|
24
| Power Grid Lucknow | NR3/NT/G-MISC/DOM/K00/25/14091 / Supply of Godrej make furniture for Transit Camp of POWERGRID at Jankipuram, Lucknow | Sat, 25-Oct-2025 11:00 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 12:16 PM |
View
| |
|
25
| Power Grid Lucknow | NR3/NT/G-MISC/DOM/K00/25/14090 / Supply of Godrej make furniture for Transit Camp of POWERGRID at Jankipuram, Lucknow | Sat, 25-Oct-2025 11:00 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 12:12 PM |
View
| |
|
26
| Power Grid Lucknow | NR3/NT/G-MISC/DOM/K00/25/14088 / Supply of Godrej make furniture for Transit Camp of POWERGRID at Jankipuram, Lucknow | Sat, 25-Oct-2025 11:00 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 12:07 PM |
View
| |
|
27
| Power Grid Lucknow | NR3/NT/G-MISC/DOM/K00/25/14086 / Supply of Godrej make furniture for Transit Camp of POWERGRID at Jankipuram, Lucknow | Sat, 25-Oct-2025 11:00 AM / Sat, 25-Oct-2025 11:30 AM
| Wed, 22-Oct-2025 12:03 PM |
View
| |
|
28
| Chandwa | ER2/NT/S-MISC/DOM/ZA4/25/14070 / Hiring Point to Point Lease Bandwidth towards extending last-mile connectivity to NTPC Mining Ltd, North Dhadu Coal Mine Project Office, Chandwa for a period of 02 years | Mon, 03-Nov-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Wed, 22-Oct-2025 10:59 AM |
View
| |
|
29
| Somanahalli Substation | SR2/NT/W-CIVIL/DOM/C00/25/13080 / Construction of switchyard panel rooms at POWERGRID, Somanahalli Substation | Mon, 17-Nov-2025 11:00 AM / Wed, 19-Nov-2025 11:30 AM
| Tue, 21-Oct-2025 11:00 AM |
View
| |
|
30
| Gwalior | WR1/NT/S-MISC/DOM/ZA3/25/14060 / Dark fiber leasing from Superintendent of Police, Gwalior to High Court Gwalior for the period of three years | Fri, 31-Oct-2025 04:00 PM / Fri, 31-Oct-2025 04:30 PM
| Tue, 21-Oct-2025 04:15 PM |
View
| |
|
31
| Gwalior | WR1/NT/S-MISC/DOM/ZA3/25/14059 / Dark fiber leasing from MPPTCL 220KV Substation Gwalior to Airforce station Gwalior and Ayurvedic Hospital to High Court Gwalior for the period of three years | Fri, 31-Oct-2025 04:00 PM / Fri, 31-Oct-2025 04:30 PM
| Tue, 21-Oct-2025 04:15 PM |
View
| |
|
32
| Indore | WR1/NT/S-MISC/DOM/ZA3/25/14058 / Dark fiber leasing for High Court Indore to Smartlink Office Indore and High Court Indore to EPFO Regional Office Indore for the period of three years | Fri, 31-Oct-2025 03:00 PM / Fri, 31-Oct-2025 03:30 PM
| Tue, 21-Oct-2025 04:10 PM |
View
| |
|
33
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/14057 / Underground dark fiber leasing from Airforce Marine Line to CP Office Crawford Market, Fort and Airforce Marine Line to PowerTel Chamber, IN Gate Nariman for the period of three years | Fri, 31-Oct-2025 03:00 PM / Fri, 31-Oct-2025 03:30 PM
| Tue, 21-Oct-2025 04:05 PM |
View
| |
|
34
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/14053 / Underground Dark fiber leasing from TCL Fort to BSNL Prabhadevi for the period of Five years | Fri, 31-Oct-2025 01:00 PM / Fri, 31-Oct-2025 01:30 PM
| Tue, 21-Oct-2025 04:05 PM |
View
| |
|
35
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/14052 / Underground Dark fiber leasing from POWERTEL Chamber TCL Prabhadevi to TCL BKC for the period of Five years | Fri, 31-Oct-2025 12:00 PM / Fri, 31-Oct-2025 12:30 PM
| Tue, 21-Oct-2025 04:00 PM |
View
| |
|
36
| Guwahati | ER2/NT/S-MISC/DOM/ZA4/25/13396 / Hiring of Vehicle for Guwahati Telecom Office for a period of 3 Years | Thu, 20-Nov-2025 11:00 AM / Thu, 20-Nov-2025 11:30 AM
| Tue, 21-Oct-2025 10:23 AM |
View
| |
|
37
| Salem and Sriperumbudur Substation | SR2/NT/W-CIVIL/DOM/C00/25/12966 / Construction of switchyard panel rooms at Salem and Sriperumbudur sub-stations in SR-2 | Mon, 17-Nov-2025 10:20 AM / Wed, 19-Nov-2025 11:30 AM
| Tue, 21-Oct-2025 11:00 AM |
View
| |
|
38
| Vadodara, Gujarat | CC/NT/S-VHCLE/DOM/T00/25/13083 / Engaging 01 No vehicle under PESL Vadodara Office for Vadodara Circle | Tue, 18-Nov-2025 11:00 AM / Tue, 18-Nov-2025 11:30 AM
| Sun, 19-Oct-2025 04:40 PM |
View
| |
|
39
| Anand, Nadiad, Gujarat | CC/NT/S-VHCLE/DOM/T00/25/13082 / Engaging 01 No vehicle under PESL Vadodara Office for Anand/Nadiad Circle | Tue, 18-Nov-2025 11:00 AM / Tue, 18-Nov-2025 11:30 AM
| Sun, 19-Oct-2025 04:40 PM |
View
| |
|
40
| Godhara, Gujarat | CC/NT/S-VHCLE/DOM/T00/25/13081 / Engaging 01 No vehicle under PESL Vadodara Office for Godhara Circle | Tue, 18-Nov-2025 11:00 AM / Tue, 18-Nov-2025 11:30 AM
| Sun, 19-Oct-2025 04:40 PM |
View
| |
|
41
| Bikaner-IV S/S | NR1/T/W-CIVIL/DOM/I00/25/13562 / Augmentation of transformation capacity at 400/220 kV Bikaner-IV S/S by 2x500 MVA, 400/220kV ICT (7 th and 8 th ) along with associated bays and implementation of 3 nos. of 220 kV line bays | Mon, 17-Nov-2025 11:00 AM / Wed, 19-Nov-2025 11:30 AM
| Sun, 19-Oct-2025 03:10 PM |
View
| |
|
42
| NR-I | NR3/NT/G-IT/DOM/CP1/25/14002 / Procurement of All In One Desktop Computers for various sites in NR-I | Sat, 01-Nov-2025 11:00 AM / Sat, 01-Nov-2025 11:30 AM
| Fri, 17-Oct-2025 06:09 PM |
View
| |
|
43
| Coimbatore | SR2/NT/S-MISC/DOM/ZA1/25/14001 / leasing agency for IAF last mile aerial leased fiber from 3rd party in Sulur andCoimbatore for a period of three years | Tue, 28-Oct-2025 11:00 AM / Tue, 28-Oct-2025 11:30 AM
| Fri, 17-Oct-2025 03:50 PM |
View
| |
|
44
| Jharkhand and North Bengal | ER2/NT/S-MISC/DOM/ZA4/25/13997 / Hiring dark fiber on lease in 02 different paths for GAIL Murma, Ranchi Last-mile connectivity, for PVUNL Office, Latehar Last-mile connectivity in 02 different paths and for Airforce Station Hashimara in North Bengal for a period of 05 years | Tue, 28-Oct-2025 11:00 AM / Tue, 28-Oct-2025 11:30 AM
| Fri, 17-Oct-2025 03:12 PM |
View
| |
|
45
| Fatehpur | NR3/NT/G-CB/DOM/K00/25/10915 / Procurement of 01 no. MSB circuit breaker for ACDB protection system at POWERGRID 765/400/220kV Fatehpur Sub-Station | Wed, 22-Oct-2025 11:30 AM / Wed, 22-Oct-2025 11:30 AM
| Fri, 17-Oct-2025 02:38 PM |
View
| |
|
46
| Bhadla 2 SS Powergrid | NR1/NT/W-CIVIL/DOM/I00/25/13363 / construction of 2 Nos Open store Platform Size 50x20 and 450 x3.75m RCC Road for 765/400/220 Kv Bhadla-2 Substation | Sat, 15-Nov-2025 11:00 AM / Tue, 18-Nov-2025 11:30 AM
| Fri, 17-Oct-2025 10:00 AM |
View
| |
|
47
| Fatehpur | NR3/NT/S-HORT/DOM/K00/25/13968 / Maintenance Contract for two years for horticulture maintenance at 765 by 400 by 220kV substation of POWERGRID at Fatehpur | Mon, 03-Nov-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Thu, 16-Oct-2025 11:00 AM |
View
| |
|
48
| Sitarganj, Pithoragarh and Jauljibi | NR3/NT/S-AMC/DOM/K00/25/13967 / Pest Control Services for two years at Sitarganj, Jauljibi and Pithoragarh substations of POWERGRID | Fri, 31-Oct-2025 11:00 AM / Fri, 31-Oct-2025 11:30 AM
| Thu, 16-Oct-2025 11:00 AM |
View
| |
|
49
| India | CC/NT/G-INS/DOM/A04/25/12947 / Bus Post Insulator Package: BPI-01 | Fri, 14-Nov-2025 11:00 AM / Fri, 14-Nov-2025 11:30 AM
| Wed, 15-Oct-2025 06:43 PM |
View
| |
|
50
| RHQ-LUCKNOW | NR3/NT/W-CIVIL/DOM/K00/25/13775 / Providing and fixing concertina coil over existing boundary wall at Regional Head Quarter building campus of POWERGRID at Awadh Vihar Yogna, Amar Shaheed Path, Lucknow | Fri, 31-Oct-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Wed, 15-Oct-2025 08:00 PM |
View
| |
|
51
| Dambuk and Tezu at Arunachal Pradesh | NER/NT/G-TW/DOM/H03/25/13378 / Supply of Tower parts CTDS-AP | Wed, 05-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM
| Wed, 15-Oct-2025 01:00 PM |
View
| |
|
52
| Gurugram | CC/NT/W-MISC/DOM/A14/25/13099 / Construction of water fountain in lawn area, POWERGRID field hostel at sector 46, Gurugram | Tue, 04-Nov-2025 11:00 AM / Thu, 06-Nov-2025 11:30 AM
| Wed, 15-Oct-2025 10:18 AM |
View
| |
|
53
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13812 / Dark fiber leasing from MIHAN to CICR for the period of three years | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Tue, 14-Oct-2025 10:55 AM |
View
| |
|
54
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13815 / Underground dark fiber leasing from Airforce JNPT to ONGC Panvel for the period of three years | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Tue, 14-Oct-2025 10:50 AM |
View
| |
|
55
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13813 / Underground dark fiber leasing from Airforce JNPT to PGCIL Chamber Park Hotel for the period of three years | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Tue, 14-Oct-2025 10:50 AM |
View
| |
|
56
| Indore | WR1/NT/S-MISC/DOM/ZA3/25/13816 / Dark fiber leasing from SCADA (MPPTCL 220Kv, South Zone, Indore) to Intellicus, Crystal IT Park for the period of three years | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Tue, 14-Oct-2025 10:45 AM |
View
| |
|
57
| WEST BENGAL | ER2/NT/G-COND/DOM/E00/25/10372 / Procurement of ACSR Moose conductor for Durgapur, Subhasgram and Maithon Substation | Wed, 12-Nov-2025 03:00 PM / Wed, 12-Nov-2025 03:30 PM
| Mon, 13-Oct-2025 06:20 PM |
View
| |
|
58
| Durgapur, West Bengal | ER2/NT/S-HKW/DOM/E00/25/12295 / Annual maintenance contract for housekeeping and horticulture work at Durgapur substation | Wed, 12-Nov-2025 11:00 AM / Wed, 12-Nov-2025 11:30 AM
| Mon, 13-Oct-2025 06:15 PM |
View
| |
|
59
| NEEMUCH, MADHYA PRADESH | CC/NT/S-HKW/DOM/T00/25/13782 / Manpower for Sanitation, Housekeeping and cleaning of various buildings, switchyard of 400kV Neemuch Substation. | Wed, 12-Nov-2025 06:00 PM / Wed, 12-Nov-2025 05:59 PM
| Mon, 13-Oct-2025 06:00 PM |
View
| |
|
60
| Multi Locations | CC/T/W-AIS/DOM/A01/25/13517 / 765kV AIS New Substation Package SS 144T | Sat, 08-Nov-2025 11:55 PM / Mon, 10-Nov-2025 11:30 AM
| Mon, 13-Oct-2025 05:43 PM |
View
| |
|
61
| Northern Region-II, Western Region-II and Eastern Region-II of POWERGRID | NR3/NT/G-MISC/DOM/CP1/25/13784 / Supply of Electrical Clearance Measurement Instrument (Laser Range Finder) at Various locations of Northern Region-II, Western Region-II and Eastern Region-II of POWERGRID | Wed, 05-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM (Corrigendum Id: 36033) | Mon, 13-Oct-2025 04:35 PM |
View
| 36033 dated Tue, 28-Oct-2025 09:25 AM
|
|
62
| Andhra Pradesh | CC/T/W-AIS/DOM/A00/25/13524 / 765kV AIS New Substation Package SS-149T | Sat, 08-Nov-2025 11:55 PM / Mon, 10-Nov-2025 11:30 AM
| Mon, 13-Oct-2025 02:00 PM |
View
| |
|
63
| Sikkim | ER2/NT/S-MISC/DOM/ZA4/25/13735 / Hiring dark fiber on lease for last mile connectivity to various customers of Namchi, Sikkim | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Mon, 13-Oct-2025 02:52 PM |
View
| |
|
64
| NR-1, NR-2 and ER-2 | NR3/NT/G-MISC/DOM/CP1/25/13756 / Supply of 145 kV RIP/RIS Bushings to various substations of NR-I, NR-II and ER-II regions of POWERGRID | Mon, 03-Nov-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Mon, 13-Oct-2025 11:00 AM |
View
| |
|
65
| KURNOOL IV | SR1/T/W-CIVIL/DOM/B00/25/13740 / WC 4220R CONSTRUCTION OF TRANSIT CAMP CUM FIELD HOSTEL AT KURNOOL-IV POOLING STATION | Tue, 28-Oct-2025 11:00 AM / Tue, 28-Oct-2025 11:30 AM
| Mon, 13-Oct-2025 11:00 AM |
View
| |
|
66
| Power Grid Corporation of India Ltd, 765/400 KV Pooling Station, Village-Taga, Tehsil-Akaltara, Janggir- 495668, Chattisgarh | WR1/NT/W-MISC/DOM/F01/25/12993 / Water proofing work of Valve Hall Buildings at HVDC-Champa | Wed, 12-Nov-2025 05:00 PM / Wed, 19-Nov-2025 03:30 PM
| Mon, 13-Oct-2025 12:10 PM |
View
| |
|
67
| NR-1 G1, NR-1 G2, NR-2, NR-3, NER, ER-1, ER-2, NER, Odisha, SR-1, SR-2, WR-1, WR-2 | NR3/NT/G-INS/DOM/CP1/25/13744 / Supply of 400KV 120kN, 160 kN 210 kN CLR Polymer Insulator to various locations of POWERGRID (NCN0212) | Fri, 31-Oct-2025 11:00 AM / Fri, 31-Oct-2025 11:30 AM (Corrigendum Id: 36009) | Mon, 13-Oct-2025 10:30 AM |
View
| 36009 dated Fri, 24-Oct-2025 11:25 AM
|
|
68
| Gujarat | WR2/NT/S-MISC/DOM/G01/25/13718 / HIRING OF FURNISHED OFFICE PREMISES ON LEASE RENTAL BASIS FOR ESTABLISHMENT OF KHAVDA HVDC PROJECT OFFICE AT AHMEDABAD / GANDHINAGAR OF AROUND 10,000 SQ. FT. FOR THE PERIOD OF 05 YEARS | Thu, 23-Oct-2025 03:00 PM / Thu, 23-Oct-2025 03:50 PM
| Mon, 13-Oct-2025 06:00 AM |
View
| |
|
69
| India | CC/NT/W-GIS/DOM/A02/25/13385 / GIS Package (TR-202577PKG01) | Tue, 04-Nov-2025 11:00 AM / Tue, 04-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 07:03 PM |
View
| |
|
70
| India | CC/NT/W-RT/DOM/A04/25/12879 / 420kV Reactor Package 4RT-11- BULK (AM) | Mon, 10-Nov-2025 11:00 AM / Mon, 10-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 06:57 PM |
View
| |
|
71
| JAMSHEDPUR | CC/T/W-AIS/DOM/A00/25/13408 / 765kV AIS New Substation Package SS 139T for (i)Establishment of 765/400kV S/s at Jamshedpur (New) in Jharkhand (ii) Extension of 765/400kV Jeerat S/s under WR-ER Inter-Regional Network Expansion Scheme-Part A through TBCB route. | Wed, 05-Nov-2025 11:55 PM / Fri, 07-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 06:52 PM |
View
| |
|
72
| Gurugram | CC/NT/S-CONS/DOM/A00/25/13563 / Appointment of Consultant for Valuation of equity shares of POWERGRID in Torrent Power Grid Ltd (TPGL), Sikkim Power Transmission Ltd (SPTL) and Parbati Koldam Transmission Company Ltd (PKTCL) JV Companies | Wed, 15-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 06:00 PM |
View
| |
|
73
| Kurnool | CC/T/W-AIS/DOM/A00/25/13466 / Pre-bid tie-up for 765kV AIS New Substation Package SS-143T (including civil works for STATCOM) for a) Establishment of 765-400-220kV Ss at Kurnool-V Pooling Station near Odumur in Kurnool district b) Extension of 765kV Raichur (New) SS c) Civil Works for 300 MVAR STATCOM at Kurnool-V Pooling Station associated with Transmission system for integration of Kurnool-V REZ - Phase-I through TBCB route | Wed, 05-Nov-2025 11:55 PM / Fri, 07-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 06:00 PM |
View
| |
|
74
| Samba | NR2/NT/W-CIVIL/DOM/J01/25/13645 / Construction of Underground Bunker at Samba SS | Tue, 21-Oct-2025 11:00 AM / Thu, 23-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 03:40 PM |
View
| |
|
75
| 400 kV D/C Bhiwadi-Hisar-2 and3 line | NR1/NT/W-CIVIL/DOM/I00/25/13265 / Construction of concrete protection wall for Rectification of water logging /Submerged tower problem at Tower 911 to 913 of 400 kV D/C Bhiwadi-Hisar-2 and3 line | Thu, 06-Nov-2025 11:00 AM / Mon, 10-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 02:29 PM |
View
| |
|
76
| BHIWADI SUBSTATION | NR1/NT/W-CIVIL/DOM/I00/25/13281 / Construction of synthetic Lawn tennis court at Bhiwadi substation | Wed, 22-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 02:23 PM |
View
| |
|
77
| Various Substations of WR-II, NR-III and Odisha of POWERGRID | NR3/NT/G-MISC/DOM/CP1/25/13620 / Supply of 400kV and 220kV Current Transformers for various Substations of WR-II, NR-III and Odisha of POWERGRID | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 11:00 AM |
View
| |
|
78
| POWERGRID at Shaktinagar | NR3/NT/S-MISC/DOM/K00/25/12480 / Removal of rust and application of anti corrosive paint on rusted tower legs and stubs in EHV transmission lines under jurisdiction of TLM office of POWERGRID at Shaktinagar | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 08:00 PM |
View
| |
|
79
| POWERGRID at Rihand | NR3/NT/S-MISC/DOM/K00/25/13473 / Providing and application of silicon RTV coating OIP bushings of convertor transformers at HVDC station of POWERGRID at Rihand | Mon, 27-Oct-2025 11:00 AM / Mon, 27-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 10:00 AM |
View
| |
|
80
| India | CC/T/W-GIS/DOM/A04/25/13443 / 400 kV GIS Substation Package SS142T | Tue, 04-Nov-2025 11:55 PM / Thu, 06-Nov-2025 11:30 AM
| Thu, 09-Oct-2025 08:10 PM |
View
| |
|
81
| Arunachal Pradesh | CC/T/W-GIS/DOM/A02/25/13390 / 400kV GIS Substation Package SS141T | Tue, 04-Nov-2025 11:55 PM / Thu, 06-Nov-2025 11:30 AM
| Thu, 09-Oct-2025 05:00 PM |
View
| |
|
82
| Sikkim and North Bengal | ER2/NT/S-MISC/DOM/ZA4/25/13638 / Hiring dark fiber on lease for last mile connectivity to various customers of Mangan, Sikkim and for various customers in Alipurduar and Rambi in North Bengal | Mon, 20-Oct-2025 11:00 AM / Mon, 20-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 04:16 PM |
View
| |
|
83
| Kurnool-3 PS | SR1/NT/W-CIVIL/DOM/B00/25/13615 / WC 4401 Construction of Roads, Drains, Fencing and Rainwater Harvesting pits for the deferred scope at Kurnool-III PS | Mon, 27-Oct-2025 03:00 PM / Mon, 27-Oct-2025 03:30 PM (Corrigendum Id: 36006) | Thu, 09-Oct-2025 02:40 PM |
View
| 36006 dated Fri, 24-Oct-2025 11:20 AM
|
|
84
| Kurnool-3 PS | SR1/NT/W-CIVIL/DOM/B00/25/13600 / WC 4400 Land development (site levelling works) for the deferred scope at Kurnool-III PS | Mon, 27-Oct-2025 03:00 PM / Mon, 27-Oct-2025 03:30 PM (Corrigendum Id: 36005) | Thu, 09-Oct-2025 02:30 PM |
View
| 36005 dated Fri, 24-Oct-2025 11:17 AM
|
|
85
| Tamil Nadu | SR2/NT/S-MISC/DOM/ZA1/25/13607 / Leasing ofl ast mile UnderGround Optical Fiber Cable (UGOFC) for TCL Ambattur, TCL SivanandaSalai last mile connectivity in Chennai in 6 links for a period of 3 years | Mon, 20-Oct-2025 11:00 AM / Mon, 20-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 10:55 AM |
View
| |
|
86
| Anantapur | CC/T/W-AIS/DOM/A04/25/13323 / 765kV AIS New Substation package SS 145T | Tue, 04-Nov-2025 11:55 PM / Thu, 06-Nov-2025 11:30 AM
| Wed, 08-Oct-2025 08:00 PM |
View
| |
|
87
| POWERGRID Raebareli | NR3/NT/W-CIVIL/DOM/K00/25/12637 / Extension of front side boundry wall height with polycorbonate sheet at 220/132 kV substation of POWERGRID at Raebareli | Thu, 23-Oct-2025 11:00 AM / Mon, 27-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 08:00 PM |
View
| |
|
88
| KOLKATA, WEST BENGAL | ER2/NT/S-HKW/DOM/E00/25/11733 / Housekeeping, Horticulture, Office Support and Mail Management services of RHQ, Kolkata for a period of 02(Two) years | Fri, 07-Nov-2025 11:00 AM / Fri, 07-Nov-2025 11:30 AM
| Wed, 08-Oct-2025 04:00 PM |
View
| |
|
89
| WEST BENGAL | ER2/NT/S-MISC/DOM/E00/25/12760 / Replacement of defective CLR Insulators with new CLR Insulators at various Tower Locations under Berhampore TLM | Wed, 05-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM
| Wed, 08-Oct-2025 03:35 PM |
View
| |
|
90
| SHAKTINAGAR | NR3/NT/S-MISC/DOM/K00/25/12415 / REPLACEMENT OF INSULATORS | Wed, 08-Oct-2025 11:17 AM / Mon, 27-Oct-2025 11:18 AM
| Wed, 08-Oct-2025 11:17 AM |
View
| |
|
91
| PRAYAGRAJ MIRZAPUR | NR3/NT/S-MISC/DOM/K00/25/12738 / REPLACEMENT OF INSULATORS | Wed, 22-Oct-2025 11:14 AM / Wed, 22-Oct-2025 11:12 AM
| Wed, 08-Oct-2025 11:12 AM |
View
| |
|
92
| Nalagarh | NR2/NT/S-HORT/DOM/J01/25/13506 / Horticulture Works at POWERGRID Nalagarh 10 nos. Unskilled for 02 Years | Fri, 17-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 10:20 AM |
View
| |
|
93
| Ludhiana | NR2/NT/S-HORT/DOM/J01/25/13505 / Horticulture Works at POWERGRID Ludhiana 07 nos. Unskilled for 02 Years | Fri, 17-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 10:15 AM |
View
| |
|
94
| Nagpur | WR1/NT/S-MISC/DOM/ZA3/25/13514 / Dark fiber leasing for three no. of links in Nagpur | Sat, 18-Oct-2025 11:00 AM / Sat, 18-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 09:25 AM |
View
| |
|
95
| Nasik | WR1/NT/S-MISC/DOM/ZA3/25/13495 / dark fiber leasing for(Protection Path) for three no. of links In Nasik Intracity | Fri, 17-Oct-2025 12:00 PM / Fri, 17-Oct-2025 12:30 PM
| Wed, 08-Oct-2025 08:40 AM |
View
| |
|
96
| Nasik | WR1/NT/S-MISC/DOM/ZA3/25/13494 / dark fiber leasing for(main Path) for three no. of links In Nasik Intracity | Fri, 17-Oct-2025 12:00 PM / Fri, 17-Oct-2025 12:30 PM
| Wed, 08-Oct-2025 08:35 AM |
View
| |
|
97
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13493 / Underground dark fiber leasing from Air Force Station, Kolshet Post to Air Force Station, Kanehari and Underground dark fiber leasing from Air Force Station, Kolshet Post to POWERGRID Manhole Kalwa MSEB for the period of three years | Fri, 17-Oct-2025 12:00 PM / Fri, 17-Oct-2025 12:30 PM
| Wed, 08-Oct-2025 08:30 AM |
View
| |
|
98
| Chennai | SR2/NT/S-CONS/DOM/C00/25/13308 / Engagement of comprehensive architectural and structural consultant for construction of office building cum transit camp at Chennai under SR-II region of POWERGRID | Mon, 03-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM
| Tue, 07-Oct-2025 11:00 AM |
View
| |
|
99
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13481 / Underground dark fiber leasing from RBI MOB to TCL BKC for the period of Five years | Fri, 17-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Tue, 07-Oct-2025 05:35 PM |
View
| |
|
100
| Gadag | SR2/T/W-CIVIL/DOM/C00/25/12504 / Construction of Substation store at 400 kV Gadag sub-station | Thu, 30-Oct-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Tue, 07-Oct-2025 01:00 PM |
View
| |
|
101
| 400/132 kV Jalna (Dist. Jalna) under TBCB in WR-Inder TBCB in WR-I | WR1/T/W-MISC/DOM/F01/25/13264 / Engagement of Surveying Agency for carrying out Route Alignment 400/132 kV Jalna (Dist. Jalna) | Tue, 07-Oct-2025 12:05 PM / Fri, 17-Oct-2025 03:30 PM
| Tue, 07-Oct-2025 12:00 PM |
View
| |
|
102
| POWERGRID Nagarjunasagar Substation - Andhra Pradesh | SR1/NT/W-CIVIL/DOM/B00/25/12398 / AMC-II Package at POWERGRID Nagarjunasagar substation, SR-1 | Thu, 06-Nov-2025 11:00 AM / Thu, 06-Nov-2025 11:30 AM
| Tue, 07-Oct-2025 11:00 AM |
View
| |
|
103
| Nellore | SR1/NT/W-CIVIL/DOM/B00/25/12844 / Construction of Omni Shed for NLR TLM | Wed, 05-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM
| Mon, 06-Oct-2025 08:00 PM |
View
| |
|
104
| wanpoh | NR2/NT/S-HKW/DOM/J01/25/13421 / Housekeeping and General Upkeeping Services at New Wanpoh Sub Station for 02 Years | Thu, 16-Oct-2025 05:05 PM / Thu, 16-Oct-2025 05:30 PM
| Mon, 06-Oct-2025 05:04 PM |
View
| |
|
105
| SR-I, POWERGRID and WR-II, POWERGRID | NR3/NT/G-MISC/DOM/CP1/25/13374 / Supply of Hotline Maintenance Tools and Accessories for Live Line Maintenance of 765 kV / 400 kV System at various sites of SR I and WR II of POWERGRID. Specification No. NCN0182 | Mon, 03-Nov-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM (Corrigendum Id: 35994) | Fri, 03-Oct-2025 02:45 PM |
View
| 35994 dated Thu, 23-Oct-2025 01:00 PM
|
|
106
| India | CC/T/W-AIS/DOM/A02/25/13126 / Pre-Bid Tie up for 400kV AIS New Substation Package SS 138T for (i) Establishment of 400/220kV AIS Wagdari (New) S/S (ii) Extension of 400kV AIS Pune (East) S/S (iii) Extension of 400kV Solapur (PG) Pooling (AIS) S/S (iv) Extension of 220kV AIS Wagdari (Proposed) (MSETCL) S/S (v) Extension of 220kV AIS Narangwadi (Existing) (MSETCL) S/S associated with Transmission Scheme for Establishment of 400/220 kV AIS Wagdari (Dist. Solapur) through TBCB route | Wed, 29-Oct-2025 11:55 PM / Fri, 31-Oct-2025 11:30 AM (Corrigendum Id: 36011) | Fri, 03-Oct-2025 08:27 PM |
View
| 36011 dated Fri, 24-Oct-2025 11:00 AM 36007 dated Fri, 24-Oct-2025 11:21 AM 35973 dated Tue, 21-Oct-2025 12:51 PM 35901 dated Mon, 13-Oct-2025 11:11 AM
|
|
107
| Ballia | NR3/NT/S-HORT/DOM/K00/25/13337 / Maintenance Work of Grass Uprooting and Rank Vegetation at POWERGRID Substation in Ballia | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 03-Oct-2025 11:00 AM |
View
| |
|
108
| Panchkula | NR2/NT/S-HORT/DOM/J01/25/13332 / Horticulture Works at POWERGRID Panchkula (09 nos. Unskilled) for 2 years | Mon, 13-Oct-2025 06:00 PM / Mon, 13-Oct-2025 06:30 PM
| Fri, 03-Oct-2025 06:00 PM |
View
| |
|
109
| All over India | CC/T/W-TW/DOM/A10/25/12638 / TRANSMISSION LINE TL01 SASWAD (DIST. PUNE), | Wed, 29-Oct-2025 11:55 PM / Fri, 31-Oct-2025 11:30 AM (Corrigendum Id: 36015) | Mon, 13-Oct-2025 02:35 PM |
View
| 36015 dated Fri, 24-Oct-2025 04:28 PM 35978 dated Tue, 21-Oct-2025 10:58 AM 35950 dated Thu, 16-Oct-2025 04:43 PM 35906 dated Mon, 13-Oct-2025 02:34 PM 35825 dated Mon, 06-Oct-2025 12:41 PM
|
|
110
| CHANDIGARH | NR2/NT/S-HORT/DOM/J01/25/13331 / Horticulture Works at POWERGRID Hallomajra (04 nos. Unskilled) for 2 years | Mon, 13-Oct-2025 06:00 PM / Mon, 13-Oct-2025 06:30 PM
| Fri, 03-Oct-2025 05:55 PM |
View
| |
|
111
| Agra | NR3/NT/S-HORT/DOM/K00/25/13326 / Maintenance Contract for two years for horticulture maintenance at HVDC station and 765 by 400 by 220kV substation of POWERGRID at Agra | Sat, 18-Oct-2025 11:00 AM / Sat, 18-Oct-2025 11:30 AM
| Fri, 03-Oct-2025 11:00 AM |
View
| |
|
112
| All over India | CC/NT/W-RT/DOM/A10/25/12497 / 420kV Reactor Package 4RT 10 BULK AM Lot-6 | Fri, 31-Oct-2025 11:00 AM / Fri, 31-Oct-2025 11:30 AM
| Wed, 01-Oct-2025 06:30 PM |
View
| 35986 dated Thu, 23-Oct-2025 10:39 AM 35954 dated Thu, 16-Oct-2025 05:17 PM 35952 dated Thu, 16-Oct-2025 04:54 PM
|
|
113
| Bihar | ER2/NT/S-MISC/DOM/ZA4/25/11240 / Annual Maintenance Contract (AMC) of 23 kms OFC Network in Patna Intracity and Last Mile connectivity (LMC) (6.5 kms) in different cities of Bihar under ERTCC | Mon, 03-Nov-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Fri, 03-Oct-2025 05:17 PM |
View
| |
|
114
| Various Substations of NR-I, NR-II and NER of POWERGRID | NR3/NT/G-MISC/DOM/CP1/25/13315 / Supply of 400 kV Draw Lead Draw Rod type RIP RIS Bushing for various Substations of NR-I, NR-II and NER of POWERGRID. | Fri, 31-Oct-2025 11:00 AM / Fri, 31-Oct-2025 11:30 AM (Corrigendum Id: 36010) | Fri, 03-Oct-2025 02:50 PM |
View
| 36010 dated Fri, 24-Oct-2025 12:00 PM
|
|
115
| Raichur Substation | SR1/NT/W-CIVIL/DOM/B00/25/13284 / WC 4393 Construction of parallel cable trench in 765kV yard at 765 400kV Raichur Substation | Sat, 18-Oct-2025 03:00 PM / Mon, 20-Oct-2025 03:30 PM
| Fri, 03-Oct-2025 03:00 PM |
View
| |
|
116
| Northern Region-I and Western Region-I | NR3/NT/G-CABLE/DOM/CP1/25/13095 / Supply of Power and Control Cables to Northern Region-I and Western Region-I of POWERGRID | Mon, 03-Nov-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM (Corrigendum Id: 36000) | Fri, 03-Oct-2025 10:30 AM |
View
| 36000 dated Thu, 23-Oct-2025 05:35 PM
|
|
117
| POWERGRID CORPORATION OF INDIA LTD., KOZHIKODE 400kV/220kV SUBSTATION, AREEKODE, ERNAD SUBDISTRICT MALAPPURAM DISTRICT | SR2/NT/W-AIS/DOM/C00/25/12679 / Augmentation of transformation capacity at 400/220kV Kozhikode S/s(WC-4542) | Fri, 31-Oct-2025 11:00 AM / Fri, 31-Oct-2025 11:30 AM
| Wed, 01-Oct-2025 04:47 PM |
View
| |
|
118
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13124 / Procurement of 2 Nos. 2 Ton Split ACs for Aurangabad Telecom Room through GeM | Sat, 11-Oct-2025 04:00 PM / Sat, 11-Oct-2025 04:30 PM
| Wed, 01-Oct-2025 03:50 PM |
View
| |
|
119
| Trivandrum, Kerala | SR2/NT/W-AIS/DOM/C00/25/10874 / AUGMENTATION OF TRANSFORMATION CAPACITY AT 400/220KV TRIVANDRUM S/S BY 1X500 MVA ICT (4TH) | Thu, 30-Oct-2025 11:00 AM / Thu, 30-Oct-2025 11:30 AM
| Wed, 01-Oct-2025 03:35 PM |
View
| |
|
120
| J&K | NR1/NT/S-MISC/DOM/ZA2/25/12540 / PROCUREMENT OF Leased bandwidth/NLD Links between POWERGRID office RHQ Jammu and Pang Ladakh | Mon, 27-Oct-2025 12:00 PM / Mon, 27-Oct-2025 12:30 PM (Corrigendum Id: 36031) | Wed, 01-Oct-2025 02:35 PM |
View
| 36031 dated Mon, 27-Oct-2025 11:40 AM
|
|
121
| Udumalpet | SR2/NT/W-CIVIL/DOM/C00/25/12668 / AUGMENTATION / REPLACEMENT OF EXISTING 400/230KV, 315 MVA ICT-2 WITH 400/230KV 500MVA ICT AT UDUMALPET 400/230V SUBSTATION | Mon, 03-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM (Corrigendum Id: 36023) | Wed, 01-Oct-2025 03:00 PM |
View
| 36023 dated Sat, 25-Oct-2025 09:00 AM
|
|
122
| Davanagere, Bellary | CC/T/W-AIS/DOM/A06/25/12830 / 765kV AIS Extn Substation Package SS 135T | Sun, 02-Nov-2025 11:55 PM / Tue, 04-Nov-2025 11:30 AM (Corrigendum Id: 36034) | Tue, 30-Sep-2025 08:00 PM |
View
| 36034 dated Tue, 28-Oct-2025 10:35 AM
|
|
123
| RHQ, Secunderabad | SR1/NT/W-CIVIL/DOM/B00/25/13222 / WC 4382 Renovation of VIP wing of Transit Camp in RHQ Building POWERGRID Secunderabad | Wed, 15-Oct-2025 03:00 PM / Wed, 15-Oct-2025 03:30 PM
| Tue, 30-Sep-2025 05:45 PM |
View
| |
|
124
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13212 / Dark fiber leasing (Main Path)from Ctrl-S Building 6 and 7 to PowerTel Chamber NTT Mahape for the period of Three years | Wed, 15-Oct-2025 03:00 PM / Wed, 15-Oct-2025 03:30 PM
| Tue, 30-Sep-2025 05:00 PM |
View
| |
|
125
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13211 / Dark fiber leasing (Protection Path)from Ctrl-S Building 6 and 7 to PowerTel Chamber NTT Mahape for the period of Three years | Wed, 15-Oct-2025 03:00 PM / Wed, 15-Oct-2025 03:30 PM
| Tue, 30-Sep-2025 04:45 PM |
View
| |
|
126
| Andhra Pradesh, Telangana | SR1/T/W-MISC/DOM/B00/25/13013 / Wc-4385-H-Route alignment and Detail survey activities for 765kV DC Kurnool-V to Shadnagar TL Line length 240 Kms | Wed, 15-Oct-2025 11:00 AM / Wed, 15-Oct-2025 11:30 AM (Corrigendum Id: 35857) | Tue, 30-Sep-2025 04:45 PM |
View
| 35857 dated Thu, 09-Oct-2025 09:50 AM
|
|
127
| Andhra Pradesh | SR1/T/W-MISC/DOM/B00/25/13012 / WC-4385-G-Route alignment and Detail survey activities for 765kV DC Kurnool-V to Sagar TL Line length 240 Kms plus 400kV DC Sagar to Nagarjunasagar TL Line length 25 Kms Total line length 265 Kms | Wed, 15-Oct-2025 11:00 AM / Wed, 15-Oct-2025 11:30 AM (Corrigendum Id: 35856) | Tue, 30-Sep-2025 04:45 PM |
View
| 35856 dated Thu, 09-Oct-2025 09:50 AM
|
|
128
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13184 / Underground dark fiber leasing from MSEB, Kalwa to Vodafone dighe for the period of Three years | Wed, 15-Oct-2025 12:00 PM / Wed, 15-Oct-2025 12:30 PM
| Tue, 30-Sep-2025 12:15 PM |
View
| |
|
129
| Raipur | WR1/NT/S-MISC/DOM/ZA3/25/13185 / Dark fiber leasing between Medical College to EPFO for Three Years | Wed, 15-Oct-2025 12:00 PM / Wed, 15-Oct-2025 12:30 PM
| Tue, 30-Sep-2025 12:10 PM |
View
| |
|
130
| 765/400 kV Dharamjaigarh substation | WR1/NT/W-MISC/DOM/F01/25/11621 / Existing community center expansion work at 765/400 kV Dharamjaigarh substation | Tue, 28-Oct-2025 05:00 PM / Sat, 11-Oct-2025 03:30 PM
| Mon, 29-Sep-2025 03:10 PM |
View
| |