1
| Banikhet | NR2/NT/S-VHCLE/DOM/J01/26/09797 / Hiring of 01 No. of MUV Vehicle for smooth functioning of Maintenance work of transmission Lines and construction work towards diversion of line under TLO-Banikhet jurisdiction | Mon, 20-Jul-2026 06:00 PM / Mon, 20-Jul-2026 06:30 PM
| Fri, 10-Jul-2026 06:00 PM |
View
| |
|
2
| New Wanpoh Sub Station | NR2/NT/G-MISC/DOM/J01/26/09796 / Beds and mattresses for CISF at New Wanpoh Sub Stations. | Fri, 31-Jul-2026 06:00 PM / Fri, 31-Jul-2026 06:30 PM
| Fri, 10-Jul-2026 06:00 PM |
View
| |
|
3
| Multi Locations | CC/NT/G-MISC/DOM/A01/26/09568 / 765kV AIS New Substation Package SS 160T | Mon, 10-Aug-2026 11:00 AM / Wed, 12-Aug-2026 11:30 AM
| Fri, 10-Jul-2026 06:07 PM |
View
| |
|
4
| Lucknow | NR3/NT/G-MISC/DOM/K00/26/09791 / Supply of Fire Hose Pipes at 765/400KV Lucknow Substation | Wed, 22-Jul-2026 11:00 AM / Wed, 22-Jul-2026 11:30 AM
| Fri, 10-Jul-2026 05:44 PM |
View
| |
|
5
| Kanpur | NR3/NT/G-MISC/DOM/K00/26/08816 / Supply of spare clamps and connectors at 400/220kV Kanpur substation for replacement of jack bus conductor with ACSR moose conductor | Wed, 22-Jul-2026 11:00 AM / Wed, 22-Jul-2026 11:00 AM
| Fri, 10-Jul-2026 05:41 PM |
View
| |
|
6
| Kanpur | NR3/NT/G-MISC/DOM/K00/26/08034 / Supply cum Installation of Split AC for 400kV and 765kV relay room at GIS Kanpur | Wed, 15-Jul-2026 11:00 AM / Wed, 15-Jul-2026 11:30 AM
| Fri, 10-Jul-2026 05:35 PM |
View
| |
|
7
| GHIROR | NR3/T/G-MISC/DOM/K00/26/08812 / Supply of Office Furniture for Porta cabin site office at 765kV Ghiror Substation | Fri, 17-Jul-2026 11:00 AM / Fri, 17-Jul-2026 11:30 AM
| Fri, 10-Jul-2026 05:12 PM |
View
| |
|
8
| Andhra Pradesh | SR2/NT/S-MISC/DOM/ZA1/26/08724 / GEM/2026/B/7709390 | Mon, 20-Jul-2026 04:00 PM / Mon, 20-Jul-2026 04:30 PM
| Fri, 10-Jul-2026 04:03 PM |
View
| |
|
9
| Leh, Kargil and Drass | NR2/NT/W-GIS/DOM/J01/26/09777 / Supply, Installation, Testing and Commissioning of Control Switching Device (CSD) at Leh, Kargil and Drass substations for Shunt Reactor Switching | Mon, 10-Aug-2026 12:00 PM / Mon, 10-Aug-2026 12:00 PM
| Fri, 10-Jul-2026 03:40 PM |
View
| |
|
10
| Gujarat | WR1/NT/S-MISC/DOM/ZA3/26/09770 / Dark Fiber leasing for Five no. of link in Gujarat | Mon, 20-Jul-2026 12:00 PM / Mon, 20-Jul-2026 12:30 PM
| Fri, 10-Jul-2026 12:10 PM |
View
| |
|
11
| Various Substations of Odisha Region of POWERGRID | NR3/NT/G-MISC/DOM/CP1/26/09769 / Supply of Digital Insulation Tester at Various Substations of Odisha Region of POWERGRID | Sat, 25-Jul-2026 11:00 AM / Sat, 25-Jul-2026 11:30 AM
| Fri, 10-Jul-2026 11:55 AM |
View
| |
|
12
| Odisha Project POWERGRID | NR3/NT/G-INS/DOM/CP1/26/09757 / Supply of 765kV 210 kN CLR Insulator at Sundergarh (Odisha) of POWERGRID, (Specification No.: NCN0361) | Fri, 31-Jul-2026 11:00 AM / Fri, 31-Jul-2026 11:30 AM
| Fri, 10-Jul-2026 10:25 AM |
View
| |
|
13
| Misa | NER/NT/W-MISC/DOM/H00/26/08296 / Development of area near the Byrnihat bay and 220KV SPR periphery of Misa Substation | Thu, 09-Jul-2026 05:20 PM / Tue, 14-Jul-2026 11:30 AM
| Thu, 09-Jul-2026 05:18 PM |
View
| |
|
14
| Bongaigaon and Nirjuli | NER/NT/W-MISC/DOM/H00/26/02755 / Upgradation of 400kV Bongaigaon Substation from Conventional Substation to SAS substation under ADD CAP tariff block 2019-24 (Under KTLP Projects) and SAS upgradation and Upgradation of 33kV CRP at 132/33 kV Nirjuli Substation under ADD CAP 2019-24 | Thu, 09-Jul-2026 05:10 PM / Tue, 21-Jul-2026 11:30 AM
| Thu, 09-Jul-2026 05:10 PM |
View
| |
|
15
| Balipara Bongaigaon and Misa substation | NER/NT/W-MISC/DOM/H00/26/01833 / Design, manufacture, shop testing including assembly testing of engine and alternator, Dispatch and transportation to site erection, testing and commissioning with all equipment or materials DG set including dismantling of existing system at Balipara, Bongaigaon and Misa substation under NERTS ADD-CAP 2024-2029 | Thu, 09-Jul-2026 05:00 PM / Tue, 14-Jul-2026 11:30 AM
| Thu, 09-Jul-2026 04:58 PM |
View
| |
|
16
| Fatehabad Substation | NR2/NT/G-MISC/DOM/J01/26/06162 / Purchase of tables and chairs at Power Grid Fatehabad Substation (Pac | Mon, 20-Jul-2026 12:00 PM / Mon, 20-Jul-2026 12:30 PM
| Thu, 09-Jul-2026 11:45 AM |
View
| |
|
17
| Gujarat | WR1/NT/S-MISC/DOM/ZA3/26/09545 / Hiring of 4 Mbps Point to Point Bandwidth (P2P BW) on lease from third party for SBI Haripura Connectivity in Gujarat state for the period of three yearsThrough GeM Portal | Mon, 20-Jul-2026 05:00 PM / Mon, 20-Jul-2026 05:30 PM
| Thu, 09-Jul-2026 04:40 PM |
View
| |
|
18
| Fatehabad Substation | NR2/NT/G-MISC/DOM/J01/26/09726 / Purchase of tables and chairs at Power Grid Fatehabad Substation (Package-B) | Mon, 20-Jul-2026 12:30 PM / Mon, 20-Jul-2026 12:30 PM
| Thu, 09-Jul-2026 11:50 AM |
View
| |
|
19
| NR-II & NR-III | NR3/NT/G-MISC/DOM/CP1/26/09738 / Supply of Digital Level Meter cum Level Generator Kit at various locations of NR-II and NR-III of POWERGRID. NCN0362 | Thu, 30-Jul-2026 11:00 AM / Thu, 30-Jul-2026 11:30 AM
| Thu, 09-Jul-2026 04:30 PM |
View
| |
|
20
| Kerala | SR2/NT/S-MISC/DOM/ZA1/26/09730 / GEM/2026/B/7766228 | Mon, 20-Jul-2026 11:00 AM / Mon, 20-Jul-2026 11:30 AM
| Thu, 09-Jul-2026 03:50 PM |
View
| |
|
21
| NR-III | NR3/NT/G-MISC/DOM/CP1/26/09729 / Supply of Automatic Relay Test kit to various sites of Northern Region-III of POWERGRID. NCN0356 | Thu, 30-Jul-2026 11:00 AM / Thu, 30-Jul-2026 11:30 AM
| Thu, 09-Jul-2026 02:10 PM |
View
| |
|
22
| Odisha | ER2/NT/S-MISC/DOM/ZA4/26/09718 / Renewal of lease fiber links in Odisha (re-tendering of PowerTel Manhole to NTPC Talcher) | Mon, 20-Jul-2026 11:00 AM / Mon, 20-Jul-2026 11:30 AM
| Thu, 09-Jul-2026 12:26 PM |
View
| |
|
23
| Abdullapur SS | NR2/NT/S-MAN/DOM/J01/26/09542 / Hiring of 10 nos of highly skilled fitters to be stationed at TL office of Abdullapur SS | Sat, 18-Jul-2026 05:00 PM / Sat, 18-Jul-2026 05:30 PM
| Wed, 08-Jul-2026 05:00 PM |
View
| |
|
24
| Gujarat | CC/T/W-TW/DOM/A02/26/09456 / TL05 for Lakadia-II to Vataman 765 KV D/C Line (Part-II) | Sat, 18-Jul-2026 11:55 PM / Mon, 20-Jul-2026 11:30 AM
| Wed, 08-Jul-2026 04:18 PM |
View
| |
|
25
| Odisha | ER2/NT/S-MISC/DOM/EC4/26/09686 / Engagement of fitters on SOS basis in Various transmission lines under Odisha project to attend Shutdown and Non-shutdown nature defects. [Spc. No. ODP/BB/C&M-4568/GeM-24/26-27] | Thu, 16-Jul-2026 01:00 PM / Thu, 16-Jul-2026 01:30 PM
| Wed, 08-Jul-2026 04:06 PM |
View
| |
|
26
| Keonjhar, Odisha | ER2/NT/W-TR/DOM/EC4/26/09664 / Dragging of Failed 315 MVA Transformer from Temporary Storage to the spare foundation at POWERGRID, Keonjhar sub-station | Wed, 15-Jul-2026 04:00 PM / Wed, 15-Jul-2026 04:30 PM
| Wed, 08-Jul-2026 03:55 PM |
View
| |
|
27
| Gujarat | WR1/NT/S-MISC/DOM/ZA3/26/08860 / Lastmile connectivity of Airforce Jamnagar and Samana in Saurashtra Region | Fri, 07-Aug-2026 03:00 PM / Fri, 07-Aug-2026 03:30 PM
| Wed, 08-Jul-2026 01:30 PM |
View
| |
|
28
| Bolangir and Kaniha | ER2/NT/G-MISC/DOM/EC4/26/09678 / Supply of Poly Carbonate Anti Bird Spike for transmission lines under Odisha Projects | Thu, 23-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Wed, 08-Jul-2026 11:00 AM |
View
| |
|
29
| Bhubaneswar | ER2/NT/S-AMC/DOM/EC4/26/09675 / Annual Maintenance Contract for CCTV System installed in Office building at POWERGRID Bhubaneswar | Sat, 18-Jul-2026 01:00 PM / Sat, 18-Jul-2026 01:30 PM
| Wed, 08-Jul-2026 12:30 PM |
View
| |
|
30
| Samba | NR2/NT/W-CIVIL/DOM/J01/26/09669 / Bypassing of both circuits of the 400 kV KishenpurSamba DC line (twin) and the 400 kV SambaJalandhar DC line (twin) at Samba substation end | Wed, 15-Jul-2026 11:00 AM / Fri, 17-Jul-2026 11:30 AM
| Wed, 08-Jul-2026 12:50 PM |
View
| |
|
31
| Patiala Substation | NR2/NT/G-IT/DOM/J01/26/09674 / Proposal for the purchase of 01 number A3/A4 medium-duty multifunction laser printer (monochrome) for Patiala sub-center. | Sat, 18-Jul-2026 01:00 PM / Sat, 18-Jul-2026 01:30 PM
| Wed, 08-Jul-2026 01:00 PM |
View
| |
|
32
| WEST BENGAL | ER2/NT/W-IT/DOM/E00/26/09125 / SITC of of CCTV and accessories for surveillance system in ER-II | Thu, 23-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Wed, 08-Jul-2026 12:10 PM |
View
| |
|
33
| Maithon, West Bengal | ER2/NT/S-AMC/DOM/E00/26/09123 / AMC of Air condition Machines | Thu, 06-Aug-2026 11:00 AM / Thu, 06-Aug-2026 11:30 AM
| Wed, 08-Jul-2026 12:00 PM |
View
| |
|
34
| Binaguri, West Bengal | ER2/NT/S-AMC/DOM/E00/26/05526 / Comprehensive Annual Maintenance Contract (AMC) for Air Conditioner system | Thu, 06-Aug-2026 11:00 AM / Thu, 06-Aug-2026 11:30 AM
| Wed, 08-Jul-2026 11:55 AM |
View
| |
|
35
| Gujarat | CC/T/W-TW/DOM/A02/26/09461 / TL04 for Lakadia-II to Vataman 765 kV D/c line (Part-I ) | Wed, 15-Jul-2026 11:55 PM / Fri, 17-Jul-2026 11:30 AM
| Wed, 08-Jul-2026 10:35 AM |
View
| |
|
36
| Itarsi, MP | WR2/NT/W-MISC/DOM/G01/26/09630 / Retrofitting of Control and Relay Panel | Tue, 28-Jul-2026 03:00 PM / Tue, 28-Jul-2026 03:30 PM
| Wed, 08-Jul-2026 10:09 AM |
View
| |
|
37
| Angul, Odisha | ER2/NT/G-OFFEQ/DOM/EC4/26/09645 / Supply of Office Furniture (Godrej Make) for POWERGRID, Kishorenagar TLM office. [Spec.no: ODP/BB/C&M-4595/GeM-37/26-27]. | Thu, 06-Aug-2026 11:00 AM / Thu, 06-Aug-2026 11:30 AM
| Tue, 07-Jul-2026 06:23 PM |
View
| |
|
38
| Angul, Odisha | ER2/NT/S-MISC/DOM/EC4/26/09646 / Rate contract for hiring of JCB/Excavator & Tractor as & when required basis for clearing and shifting Bushes/wild grass/Agri waste in Transmission Line corridor under POWERGRID, Angul TLM [Spec.no: ODP/BB/C&M-4594/GeM-36/26-27] | Thu, 06-Aug-2026 03:00 PM / Thu, 06-Aug-2026 03:30 PM
| Tue, 07-Jul-2026 05:21 PM |
View
| |
|
39
| WR-I, NR-II and SR-II | NR3/NT/G-MISC/DOM/CP1/26/09644 / Supply of 145 kV Draw Rod/Draw Lead and Solid Stem RIP/RIS bushing for various substation of WR-I, NR-II and SR-II of POWERGRID (Specification. No.: NCN0341) | Tue, 28-Jul-2026 11:00 AM / Tue, 28-Jul-2026 11:30 AM
| Tue, 07-Jul-2026 04:51 PM |
View
| |
|
40
| Madhya pradesh | WR1/NT/S-MISC/DOM/ZA3/26/09541 / Hiring of 10 Mbps P2P bandwidth at SP Office MAIHAR, SP Office, PANDHURNA and SP Office MAUGANJ for the period of Five years Through GeM Portal | Fri, 17-Jul-2026 05:00 PM / Fri, 17-Jul-2026 05:30 PM
| Tue, 07-Jul-2026 04:50 PM |
View
| |
|
41
| Aizawl | ER2/NT/S-MISC/DOM/ZA4/26/09642 / Hiring of dark fiber links BSF Aizawl to SIFY and BSF Aizawl to NIT | Mon, 20-Jul-2026 11:00 AM / Mon, 20-Jul-2026 11:30 AM
| Tue, 07-Jul-2026 04:10 PM |
View
| |
|
42
| Odisha Project POWERGRID | NR3/NT/G-INS/DOM/CP1/26/09621 / Supply of 245 kV Bus Post Insulators at Odisha Region of POWERGRID; (Specification No.: NCN0353) | Tue, 28-Jul-2026 11:00 AM / Tue, 28-Jul-2026 11:30 AM
| Tue, 07-Jul-2026 12:45 PM |
View
| |
|
43
| NER | NER/NT/G-MISC/DOM/H03/26/09582 / Supply of Safety Kits (Quilts) for contract workers under NERPSIP | Fri, 17-Jul-2026 10:00 AM / Fri, 17-Jul-2026 10:30 AM
| Tue, 07-Jul-2026 10:00 AM |
View
| |
|
44
| BANGALORE | SR2/NT/S-MISC/DOM/ZA1/26/09351 / GEM/2026/B/7752385 | Sat, 18-Jul-2026 11:00 AM / Sat, 18-Jul-2026 11:30 AM
| Tue, 07-Jul-2026 12:13 PM |
View
| |
|
45
| Transmission Lines in Southern Region-I and Western Region-I of POWERGRID | NR3/NT/G-MISC/DOM/CP1/26/09619 / Supply of Various Types of Conductor Accessories up to 800 kV HVDC Transmission Lines in Southern Region-I and Western Region-I of POWERGRID | Tue, 28-Jul-2026 11:00 AM / Tue, 28-Jul-2026 11:30 AM
| Tue, 07-Jul-2026 11:00 AM |
View
| |
|
46
| kishenpur | NR2/NT/S-MAN/DOM/J01/26/09501 / Hiring of 10 nos of highly skilled fitters to be stationed at TL office of Kishenpur SS for Routine Emergency Breakdown maintenance works and cross patrolling of Transmission Systems under Northern Region II | Fri, 17-Jul-2026 11:00 AM / Fri, 17-Jul-2026 11:30 AM
| Tue, 07-Jul-2026 10:55 AM |
View
| |
|
47
| Gurjrat | CC/T/W-TW/DOM/A00/26/09451 / Transmission Line Package TL03 Lakadia-II to Ahmedabad 765 kV D/c line (Part-II) | Tue, 14-Jul-2026 11:55 PM / Thu, 16-Jul-2026 11:30 AM
| Mon, 06-Jul-2026 08:10 PM |
View
| |
|
48
| All over India | CC/T/W-TW/DOM/A00/26/09489 / TL02 Lakadia-II to Ahmedabad 765 kV D/c line Part-I associated with Transmission system for Integration of Power from RE Projects in Lakadia REZ in Gujarat-Phase II (7500MW) through tariff based competitive bidding (TBCB) route. | Tue, 14-Jul-2026 11:55 PM / Thu, 16-Jul-2026 11:30 AM
| Mon, 06-Jul-2026 06:00 PM |
View
| |
|
49
| POWERGRID 400/132 kV Lakhisarai substation | ER1/NT/W-CIVIL/DOM/D00/26/08728 / construction of 655mtr. Peripheral Road along the Boundary wall to enhance the security at 400/132 kV Lakhisarai substation. | Wed, 05-Aug-2026 11:00 AM / Wed, 05-Aug-2026 11:30 AM
| Mon, 06-Jul-2026 06:02 PM |
View
| |
|
50
| Jammu | NR2/NT/W-MISC/DOM/J01/26/09499 / Water proofing Treatment over terraces of POWERGRID Residential Quarters Jammu | Tue, 21-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Mon, 06-Jul-2026 12:46 PM |
View
| |
|
51
| AS PER BID | WR2/NT/S-MAN/DOM/G01/26/09404 / Hiring of 35 Repeater operators and 01 Supervisor for aperiod of 02 years (extendable by 01 year) for OPGW Repeater Stations in WR II through GeM portal | Tue, 21-Jul-2026 03:00 PM / Tue, 21-Jul-2026 03:30 PM
| Sat, 04-Jul-2026 02:47 PM |
View
| |
|
52
| India | CC/NT/W-MISC/DOM/A06/26/08429 / Package P01 for Development of Pole Structures for 765 kV D/C Transmission Lines. | Mon, 03-Aug-2026 11:00 AM / Mon, 03-Aug-2026 11:30 AM
| Fri, 03-Jul-2026 06:30 PM |
View
| |
|
53
| WR-I and NR-II | NR3/NT/W-CB/DOM/CP1/26/09524 / Supply and Retrofitment of 420KV Circuit Breakers Without PIR at various substation of NR-II and WR-I Regions of POWERGRID, Specification. No.: NCN0335 | Fri, 24-Jul-2026 11:00 AM / Fri, 24-Jul-2026 11:30 AM
| Fri, 03-Jul-2026 03:40 PM |
View
| |
|
54
| Pune | WR1/NT/S-MISC/DOM/ZA3/26/09518 / Dark Fiber Lease from POWERGRID Manhole at Bhakti shakti chowk to MSEDCL Chinchwad Subdivision Office for the period of One years. | Mon, 06-Jul-2026 03:00 PM / Mon, 06-Jul-2026 03:30 PM
| Fri, 03-Jul-2026 02:35 PM |
View
| |
|
55
| Gangtok SS | ER2/NT/W-CIVIL/DOM/E00/26/06751 / Miscellaneous civil repairing works at Gangtok Guest House, Field Hostel and D-Type Quarters and Roof treatment of other quarter | Sun, 02-Aug-2026 05:00 PM / Mon, 03-Aug-2026 11:30 AM
| Fri, 03-Jul-2026 12:40 PM |
View
| |
|
56
| SR-I, SR-II and NER of POWERGRID | NR3/NT/G-CB/DOM/CP1/26/09487 / Supply and Retrofitment of 420kV Circuit Breakers (without PIR) at various substation of SR-I, SR-II and NER of POWERGRID; Specification no.NCN0336 | Thu, 23-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Fri, 03-Jul-2026 10:30 AM |
View
| |
|
57
| Cuttack TLM Jurisdiction | ER2/NT/W-MISC/DOM/EC4/26/09488 / Supply of Aviation Globule, dismantling of damaged Aviation Globule and Installation of new Aviation Globule in Transmission lines under POWERGRID Odisha Projects | Thu, 23-Jul-2026 08:00 PM / Thu, 23-Jul-2026 08:30 PM
| Thu, 02-Jul-2026 07:30 PM |
View
| |
|
58
| Various Substations in NR-III and Odisha Regions | NR3/NT/W-MISC/DOM/CP1/26/09457 / Supply and Retrofitment of Ni-Cd Battery Banks at various Substations in NR-III and Odisha Regions of POWERGRID (Specification No.: NCN0344) | Thu, 23-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Thu, 02-Jul-2026 03:45 PM |
View
| |
|
59
| WR-II | NR3/NT/G-MISC/DOM/CP1/26/09449 / Supply of SF6 Gas Dew Point Meter (RH meter) along with Portable Moisture Measurement Sensor/Probe to Western Region-II of POWERGRID, Specification No- NCN0349 | Thu, 23-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Thu, 02-Jul-2026 02:45 PM |
View
| |
|
60
| Raipur Substation of POWERGRID Western Region-I | NR3/NT/G-MISC/DOM/CP1/26/09429 / Supply of 420 kV Solid Stem RIP/RIS Bushings for Raipur Substation of POWERGRID Western Region-I | Thu, 23-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Thu, 02-Jul-2026 11:20 AM |
View
| |
|
61
| WR-I | NR3/NT/W-BESS/DOM/CP1/26/09415 / Supply and Retrofitment of VRLA Battery Banks at Solapur Substations of Western Region-I of POWERGRID; Specification No- NCN0343 | Thu, 23-Jul-2026 11:00 AM / Thu, 23-Jul-2026 11:30 AM
| Thu, 02-Jul-2026 10:10 AM |
View
| |
|
62
| Sikkim | ER2/NT/S-MISC/DOM/ZA4/26/09414 / Renewal of lease fiber links for continuation of last-mile connectivity to various customers in Sikkim | Mon, 13-Jul-2026 11:00 AM / Mon, 13-Jul-2026 11:30 AM
| Thu, 02-Jul-2026 10:05 AM |
View
| |
|
63
| WR-I, NR-II and SR-II | NR3/NT/G-MISC/DOM/CP1/26/09403 / Supply of 52 kV Solid Stem RIP RIS bushing for various substations of WR-I, NR-II and SR-II of POWERGRID. Specification. No.NCN0342 | Wed, 22-Jul-2026 11:00 AM / Wed, 22-Jul-2026 11:30 AM
| Wed, 01-Jul-2026 06:55 PM |
View
| |
|
64
| Various locations of Western Region-I and Southern Region-I of POWERGRID | NR3/NT/G-MISC/DOM/CP1/26/09390 / Supply of Various Types of Conductor and Earth Wire Accessories for Transmission Lines of Western Region-I and Southern Region-I of POWERGRID | Wed, 22-Jul-2026 11:00 AM / Wed, 22-Jul-2026 11:30 AM
| Wed, 01-Jul-2026 04:35 PM |
View
| |
|
65
| Hamirpur | NR2/NT/G-IT/DOM/J01/26/08885 / Procurement of A3/A4 size Multifunction printer for Hamirpur sub-station. | Wed, 22-Jul-2026 05:00 PM / Wed, 22-Jul-2026 05:30 PM
| Wed, 01-Jul-2026 05:00 PM |
View
| |
|
66
| Rajgarh | WR2/NT/G-TW/DOM/G01/26/09352 / Procurement of various type of towers for transmission lines under O&M add-cap 2024-29 and replenishment of towers required for Skill Development center at Rajgarh in WR-II | Sat, 04-Jul-2026 03:00 PM / Sat, 04-Jul-2026 03:30 PM
| Wed, 01-Jul-2026 12:15 PM |
View
| |
|
67
| Raipur substation | WR1/NT/W-CABLE/DOM/F01/26/08125 / Supply of 220 KV XLPE cable along with termination module & accessories including laying and termination at POWERGRID 400/220 kV Raipur substation | Tue, 21-Jul-2026 05:00 PM / Fri, 24-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 08:00 PM |
View
| |
|
68
| INDIA | CC/T/W-TW/DOM/A04/26/09176 / Transmission Line Package TL02 for South Olpad (GIS) -Nasik D/c line (Part -II) | Wed, 08-Jul-2026 11:55 PM / Fri, 10-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 09:20 PM |
View
| |
|
69
| India | CC/T/W-TW/DOM/A04/26/09254 / Transmission Line Package TL03 for South Olpad(GIS) - Nasik | Wed, 08-Jul-2026 11:55 PM / Fri, 10-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 06:44 PM |
View
| |
|
70
| India | CC/T/W-TW/DOM/A04/26/09228 / Transmission Line Package TL01 | Sun, 12-Jul-2026 11:55 PM / Tue, 14-Jul-2026 11:30 AM (Corrigendum Id: 38759) | Tue, 30-Jun-2026 05:27 PM |
View
| 38759 dated Tue, 07-Jul-2026 02:30 PM
|
|
71
| Kerala | SR2/NT/S-MISC/DOM/ZA1/26/09322 / GEM/2026/B/7669697 | Sat, 11-Jul-2026 11:00 AM / Sat, 11-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 04:55 PM |
View
| |
|
72
| Kerala | SR2/NT/S-MISC/DOM/ZA1/26/09320 / GEM/2026/B/7694546 | Sat, 11-Jul-2026 11:00 AM / Sat, 11-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 04:55 PM |
View
| |
|
73
| Orai | NR3/NT/S-HORT/DOM/K00/26/08744 / Maintenance contract for two years for horticulture maintenance at POWERGRID Orai substation | Fri, 10-Jul-2026 11:00 AM / Fri, 10-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 12:00 AM |
View
| |
|
74
| Ballia | NR3/NT/G-MISC/DOM/K00/26/08042 / Procurement of pre-filters, fine filters, and HEPA filters for the ventilation system installed in the valve halls of HVDC Ballia substation | Thu, 16-Jul-2026 11:00 AM / Thu, 16-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 12:00 AM |
View
| |
|
75
| PRAYAGRAJ | NR3/NT/G-MISC/DOM/K00/26/05259 / Procurement of 366 nos Dead-End Saver Clamp assembly along with supervision for 400KV Transmission Line crossings (NH and Railways) spans under jurisdiction of Prayagraj TLM | Thu, 16-Jul-2026 11:00 AM / Thu, 16-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 12:00 AM |
View
| |
|
76
| Agra | NR3/NT/G-MISC/DOM/K00/26/08028 / Supply of of 3.5Cx240 sqmm, 1.1 KV Aluminium conductor XLPE insulated armoured cable for PDB panels of Valve Hall Ventilation systems of Pole 1/2/3/4 at Agra S/s | Sat, 04-Jul-2026 11:00 AM / Sat, 04-Jul-2026 11:30 AM
| Tue, 30-Jun-2026 02:22 PM |
View
| |
|
77
| Lucknow, Kanpur and Gorakhpur | NR3/NT/G-MISC/DOM/K00/26/08031 / Supply of of IP PTZ Cameras and 05 Nos. Spare IP Fixed Cameras At Gorakhpur and Lucknow Substation | Fri, 07-Aug-2026 11:00 AM / Tue, 07-Jul-2026 11:00 AM
| Tue, 30-Jun-2026 02:14 PM |
View
| |
|
78
| Kishenpur. | NR2/NT/G-MISC/DOM/J01/26/08271 / Procurement of Ferric Alum (Gr-IV) for use in water Filtration Plant at POWERGRID, Kishenpur. | Fri, 10-Jul-2026 01:00 PM / Fri, 10-Jul-2026 01:30 PM
| Tue, 30-Jun-2026 12:55 PM |
View
| |
|
79
| Ludhiana Substation | NR2/NT/S-MISC/DOM/J01/26/08879 / Calibration of Testing Kits at POWERGRID Ludhiana Sub-Station. | Tue, 21-Jul-2026 01:00 PM / Tue, 21-Jul-2026 01:30 PM
| Tue, 30-Jun-2026 01:00 PM |
View
| |
|
80
| LUDHIANA | NR2/NT/W-MISC/DOM/J01/26/09270 / Urgent requirement of RTV coating at Insulators of SVC Ludhiana to mitigate flashover issue due to high pollution. | Mon, 20-Jul-2026 06:00 PM / Mon, 20-Jul-2026 06:30 PM
| Mon, 29-Jun-2026 06:00 PM |
View
| |
|
81
| All over India | CC/T/W-PILE/DOM/A10/26/08899 / Pile foundation Package PL-01 | Mon, 13-Jul-2026 11:00 AM / Mon, 13-Jul-2026 11:30 AM
| Mon, 29-Jun-2026 05:56 PM |
View
| 38774 dated Wed, 08-Jul-2026 07:16 PM
|
|
82
| Rengali | ER2/NT/S-MISC/DOM/EC4/26/09268 / Sorting, shifting, stacking of different type of spare tower parts as per drawing/BOM at POWERGRID, Rengali Station (Under AM Budget) [Spec.no: ODP/BB/C&M-4605/GeM-44/26-27]. | Thu, 09-Jul-2026 06:00 PM / Thu, 09-Jul-2026 06:30 PM
| Mon, 29-Jun-2026 05:48 PM |
View
| |
|
83
| Abdullapur | NR2/NT/G-MISC/DOM/J01/26/08984 / Procurement of 02 No Display screens for CCTV Camera at 400 220 kV Substation Abdullapur | Thu, 09-Jul-2026 06:00 PM / Thu, 09-Jul-2026 06:30 PM
| Mon, 29-Jun-2026 06:00 PM |
View
| |
|
84
| BANGALORE | SR2/NT/S-MISC/DOM/ZA1/26/09262 / GEM/2026/B/7722921 | Fri, 10-Jul-2026 11:00 AM / Fri, 10-Jul-2026 11:30 AM
| Mon, 29-Jun-2026 05:32 PM |
View
| |
|
85
| WEST BENGAL | ER2/NT/G-MISC/DOM/E00/26/08388 / Procurement of tower accessories for 400kV Tr. Lines under Subhasgram, Farakka and Berhampore TLM | Sat, 25-Jul-2026 11:00 AM / Sat, 25-Jul-2026 11:30 AM
| Mon, 29-Jun-2026 04:05 PM |
View
| |
|
86
| WR-I and NR-III | NR3/NT/W-MISC/DOM/CP1/26/09153 / Supply and Retrofitting of 400kV Pantograph Isolators at various substation of WR-I and NR-III Regions of POWERGRID. NCN0323 | Fri, 17-Jul-2026 11:00 AM / Fri, 17-Jul-2026 11:30 AM
| Sat, 27-Jun-2026 12:00 AM |
View
| |
|
87
| Gurjrat | CC/T/W-SYNCON/DOM/A00/26/08652 / synchronous condensor Package SC02T | Tue, 14-Jul-2026 11:55 PM / Thu, 16-Jul-2026 11:30 AM (Corrigendum Id: 38792) | Fri, 10-Jul-2026 10:33 AM |
View
| 38792 dated Thu, 09-Jul-2026 08:20 PM 38755 dated Tue, 07-Jul-2026 11:00 AM 38709 dated Fri, 03-Jul-2026 11:24 AM
|