1
| India | CC/NT/W-GIS/DOM/A02/25/13385 / GIS Package (TR-202577PKG01) | Tue, 04-Nov-2025 11:00 AM / Tue, 04-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 07:03 PM |
View
| |
2
| India | CC/NT/W-RT/DOM/A04/25/12879 / 420kV Reactor Package 4RT-11- BULK (AM) | Mon, 10-Nov-2025 11:00 AM / Mon, 10-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 06:57 PM |
View
| |
3
| JAMSHEDPUR | CC/T/W-AIS/DOM/A00/25/13408 / 765kV AIS New Substation Package SS 139T for (i)Establishment of 765/400kV S/s at Jamshedpur (New) in Jharkhand (ii) Extension of 765/400kV Jeerat S/s under WR-ER Inter-Regional Network Expansion Scheme-Part A through TBCB route. | Wed, 05-Nov-2025 11:55 PM / Fri, 07-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 06:52 PM |
View
| |
4
| Gurugram | CC/NT/S-CONS/DOM/A00/25/13563 / Appointment of Consultant for Valuation of equity shares of POWERGRID in Torrent Power Grid Ltd (TPGL), Sikkim Power Transmission Ltd (SPTL) and Parbati Koldam Transmission Company Ltd (PKTCL) JV Companies | Wed, 15-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 06:00 PM |
View
| |
5
| Kurnool | CC/T/W-AIS/DOM/A00/25/13466 / Pre-bid tie-up for 765kV AIS New Substation Package SS-143T (including civil works for STATCOM) for a) Establishment of 765-400-220kV Ss at Kurnool-V Pooling Station near Odumur in Kurnool district b) Extension of 765kV Raichur (New) SS c) Civil Works for 300 MVAR STATCOM at Kurnool-V Pooling Station associated with Transmission system for integration of Kurnool-V REZ - Phase-I through TBCB route | Wed, 05-Nov-2025 11:55 PM / Fri, 07-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 06:00 PM |
View
| |
6
| Samba | NR2/NT/W-CIVIL/DOM/J01/25/13645 / Construction of Underground Bunker at Samba SS | Tue, 21-Oct-2025 11:00 AM / Thu, 23-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 03:40 PM |
View
| |
7
| 400 kV D/C Bhiwadi-Hisar-2 and3 line | NR1/NT/W-CIVIL/DOM/I00/25/13265 / Construction of concrete protection wall for Rectification of water logging /Submerged tower problem at Tower 911 to 913 of 400 kV D/C Bhiwadi-Hisar-2 and3 line | Thu, 06-Nov-2025 11:00 AM / Mon, 10-Nov-2025 11:30 AM
| Fri, 10-Oct-2025 02:29 PM |
View
| |
8
| BHIWADI SUBSTATION | NR1/NT/W-CIVIL/DOM/I00/25/13281 / Construction of synthetic Lawn tennis court at Bhiwadi substation | Wed, 22-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 02:23 PM |
View
| |
9
| Various Substations of WR-II, NR-III and Odisha of POWERGRID | NR3/NT/G-MISC/DOM/CP1/25/13620 / Supply of 400kV and 220kV Current Transformers for various Substations of WR-II, NR-III and Odisha of POWERGRID | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 11:00 AM |
View
| |
10
| POWERGRID at Shaktinagar | NR3/NT/S-MISC/DOM/K00/25/12480 / Removal of rust and application of anti corrosive paint on rusted tower legs and stubs in EHV transmission lines under jurisdiction of TLM office of POWERGRID at Shaktinagar | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 08:00 PM |
View
| |
11
| POWERGRID at Rihand | NR3/NT/S-MISC/DOM/K00/25/13473 / Providing and application of silicon RTV coating OIP bushings of convertor transformers at HVDC station of POWERGRID at Rihand | Mon, 27-Oct-2025 11:00 AM / Mon, 27-Oct-2025 11:30 AM
| Fri, 10-Oct-2025 10:00 AM |
View
| |
12
| India | CC/T/W-GIS/DOM/A04/25/13443 / 400 kV GIS Substation Package SS142T | Tue, 04-Nov-2025 11:55 PM / Thu, 06-Nov-2025 11:30 AM
| Thu, 09-Oct-2025 08:10 PM |
View
| |
13
| Arunachal Pradesh | CC/T/W-GIS/DOM/A02/25/13390 / 400kV GIS Substation Package SS141T | Tue, 04-Nov-2025 11:55 PM / Thu, 06-Nov-2025 11:30 AM
| Thu, 09-Oct-2025 05:00 PM |
View
| |
14
| Sikkim and North Bengal | ER2/NT/S-MISC/DOM/ZA4/25/13638 / Hiring dark fiber on lease for last mile connectivity to various customers of Mangan, Sikkim and for various customers in Alipurduar and Rambi in North Bengal | Mon, 20-Oct-2025 11:00 AM / Mon, 20-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 04:16 PM |
View
| |
15
| Kurnool-3 PS | SR1/NT/W-CIVIL/DOM/B00/25/13615 / WC 4401 Construction of Roads, Drains, Fencing and Rainwater Harvesting pits for the deferred scope at Kurnool-III PS | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 02:40 PM |
View
| |
16
| Kurnool-3 PS | SR1/NT/W-CIVIL/DOM/B00/25/13600 / WC 4400 Land development (site levelling works) for the deferred scope at Kurnool-III PS | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 02:30 PM |
View
| |
17
| Tamil Nadu | SR2/NT/S-MISC/DOM/ZA1/25/13607 / Leasing ofl ast mile UnderGround Optical Fiber Cable (UGOFC) for TCL Ambattur, TCL SivanandaSalai last mile connectivity in Chennai in 6 links for a period of 3 years | Mon, 20-Oct-2025 11:00 AM / Mon, 20-Oct-2025 11:30 AM
| Thu, 09-Oct-2025 10:55 AM |
View
| |
18
| Anantapur | CC/T/W-AIS/DOM/A04/25/13323 / 765kV AIS New Substation package SS 145T | Tue, 04-Nov-2025 11:55 PM / Thu, 06-Nov-2025 11:30 AM
| Wed, 08-Oct-2025 08:00 PM |
View
| |
19
| POWERGRID Raebareli | NR3/NT/W-CIVIL/DOM/K00/25/12637 / Extension of front side boundry wall height with polycorbonate sheet at 220/132 kV substation of POWERGRID at Raebareli | Thu, 23-Oct-2025 11:00 AM / Mon, 27-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 08:00 PM |
View
| |
20
| KOLKATA, WEST BENGAL | ER2/NT/S-HKW/DOM/E00/25/11733 / Housekeeping, Horticulture, Office Support and Mail Management services of RHQ, Kolkata for a period of 02(Two) years | Fri, 07-Nov-2025 11:00 AM / Fri, 07-Nov-2025 11:30 AM
| Wed, 08-Oct-2025 04:00 PM |
View
| |
21
| WEST BENGAL | ER2/NT/S-MISC/DOM/E00/25/12760 / Replacement of defective CLR Insulators with new CLR Insulators at various Tower Locations under Berhampore TLM | Wed, 05-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM
| Wed, 08-Oct-2025 03:35 PM |
View
| |
22
| Nalagarh | NR2/NT/S-HORT/DOM/J01/25/13506 / Horticulture Works at POWERGRID Nalagarh 10 nos. Unskilled for 02 Years | Fri, 17-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 10:20 AM |
View
| |
23
| Ludhiana | NR2/NT/S-HORT/DOM/J01/25/13505 / Horticulture Works at POWERGRID Ludhiana 07 nos. Unskilled for 02 Years | Fri, 17-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 10:15 AM |
View
| |
24
| Nagpur | WR1/NT/S-MISC/DOM/ZA3/25/13514 / Dark fiber leasing for three no. of links in Nagpur | Sat, 18-Oct-2025 11:00 AM / Sat, 18-Oct-2025 11:30 AM
| Wed, 08-Oct-2025 09:25 AM |
View
| |
25
| Nasik | WR1/NT/S-MISC/DOM/ZA3/25/13495 / dark fiber leasing for(Protection Path) for three no. of links In Nasik Intracity | Fri, 17-Oct-2025 12:00 PM / Fri, 17-Oct-2025 12:30 PM
| Wed, 08-Oct-2025 08:40 AM |
View
| |
26
| Nasik | WR1/NT/S-MISC/DOM/ZA3/25/13494 / dark fiber leasing for(main Path) for three no. of links In Nasik Intracity | Fri, 17-Oct-2025 12:00 PM / Fri, 17-Oct-2025 12:30 PM
| Wed, 08-Oct-2025 08:35 AM |
View
| |
27
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13493 / Underground dark fiber leasing from Air Force Station, Kolshet Post to Air Force Station, Kanehari and Underground dark fiber leasing from Air Force Station, Kolshet Post to POWERGRID Manhole Kalwa MSEB for the period of three years | Fri, 17-Oct-2025 12:00 PM / Fri, 17-Oct-2025 12:30 PM
| Wed, 08-Oct-2025 08:30 AM |
View
| |
28
| Chennai | SR2/NT/S-CONS/DOM/C00/25/13308 / Engagement of comprehensive architectural and structural consultant for construction of office building cum transit camp at Chennai under SR-II region of POWERGRID | Mon, 03-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM
| Tue, 07-Oct-2025 11:00 AM |
View
| |
29
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13481 / Underground dark fiber leasing from RBI MOB to TCL BKC for the period of Five years | Fri, 17-Oct-2025 11:00 AM / Fri, 17-Oct-2025 11:30 AM
| Tue, 07-Oct-2025 05:35 PM |
View
| |
30
| Gadag | SR2/T/W-CIVIL/DOM/C00/25/12504 / Construction of Substation store at 400 kV Gadag sub-station | Thu, 30-Oct-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Tue, 07-Oct-2025 01:00 PM |
View
| |
31
| 400/132 kV Jalna (Dist. Jalna) under TBCB in WR-Inder TBCB in WR-I | WR1/T/W-MISC/DOM/F01/25/13264 / Engagement of Surveying Agency for carrying out Route Alignment 400/132 kV Jalna (Dist. Jalna) | Tue, 07-Oct-2025 12:05 PM / Fri, 17-Oct-2025 03:30 PM
| Tue, 07-Oct-2025 12:00 PM |
View
| |
32
| POWERGRID Nagarjunasagar Substation - Andhra Pradesh | SR1/NT/W-CIVIL/DOM/B00/25/12398 / AMC-II Package at POWERGRID Nagarjunasagar substation, SR-1 | Thu, 06-Nov-2025 11:00 AM / Thu, 06-Nov-2025 11:30 AM
| Tue, 07-Oct-2025 11:00 AM |
View
| |
33
| Nellore | SR1/NT/W-CIVIL/DOM/B00/25/12844 / Construction of Omni Shed for NLR TLM | Wed, 05-Nov-2025 11:00 AM / Wed, 05-Nov-2025 11:30 AM
| Mon, 06-Oct-2025 08:00 PM |
View
| |
34
| wanpoh | NR2/NT/S-HKW/DOM/J01/25/13421 / Housekeeping and General Upkeeping Services at New Wanpoh Sub Station for 02 Years | Thu, 16-Oct-2025 05:05 PM / Thu, 16-Oct-2025 05:30 PM
| Mon, 06-Oct-2025 05:04 PM |
View
| |
35
| India | CC/T/W-AIS/DOM/A02/25/13126 / Pre-Bid Tie up for 400kV AIS New Substation Package SS 138T for (i) Establishment of 400/220kV AIS Wagdari (New) S/S (ii) Extension of 400kV AIS Pune (East) S/S (iii) Extension of 400kV Solapur (PG) Pooling (AIS) S/S (iv) Extension of 220kV AIS Wagdari (Proposed) (MSETCL) S/S (v) Extension of 220kV AIS Narangwadi (Existing) (MSETCL) S/S associated with Transmission Scheme for Establishment of 400/220 kV AIS Wagdari (Dist. Solapur) through TBCB route | Sat, 11-Oct-2025 11:55 PM / Mon, 13-Oct-2025 11:30 AM
| Fri, 03-Oct-2025 08:27 PM |
View
| |
36
| Ballia | NR3/NT/S-HORT/DOM/K00/25/13337 / Maintenance Work of Grass Uprooting and Rank Vegetation at POWERGRID Substation in Ballia | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 03-Oct-2025 11:00 AM |
View
| |
37
| Panchkula | NR2/NT/S-HORT/DOM/J01/25/13332 / Horticulture Works at POWERGRID Panchkula (09 nos. Unskilled) for 2 years | Mon, 13-Oct-2025 06:00 PM / Mon, 13-Oct-2025 06:30 PM
| Fri, 03-Oct-2025 06:00 PM |
View
| |
38
| CHANDIGARH | NR2/NT/S-HORT/DOM/J01/25/13331 / Horticulture Works at POWERGRID Hallomajra (04 nos. Unskilled) for 2 years | Mon, 13-Oct-2025 06:00 PM / Mon, 13-Oct-2025 06:30 PM
| Fri, 03-Oct-2025 05:55 PM |
View
| |
39
| Agra | NR3/NT/S-HORT/DOM/K00/25/13326 / Maintenance Contract for two years for horticulture maintenance at HVDC station and 765 by 400 by 220kV substation of POWERGRID at Agra | Sat, 18-Oct-2025 11:00 AM / Sat, 18-Oct-2025 11:30 AM
| Fri, 03-Oct-2025 11:00 AM |
View
| |
40
| All over India | CC/NT/W-RT/DOM/A10/25/12497 / 420kV Reactor Package 4RT 10 BULK AM Lot-6 | Fri, 31-Oct-2025 11:00 AM / Fri, 31-Oct-2025 11:30 AM
| Wed, 01-Oct-2025 06:30 PM |
View
| |
41
| Bihar | ER2/NT/S-MISC/DOM/ZA4/25/11240 / Annual Maintenance Contract (AMC) of 23 kms OFC Network in Patna Intracity and Last Mile connectivity (LMC) (6.5 kms) in different cities of Bihar under ERTCC | Mon, 03-Nov-2025 11:00 AM / Mon, 03-Nov-2025 11:30 AM
| Fri, 03-Oct-2025 05:17 PM |
View
| |
42
| Various Substations of NR-I, NR-II and NER of POWERGRID | NR3/NT/G-MISC/DOM/CP1/25/13315 / Supply of 400 kV Draw Lead Draw Rod type RIP RIS Bushing for various Substations of NR-I, NR-II and NER of POWERGRID. | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 03-Oct-2025 02:50 PM |
View
| |
43
| Raichur Substation | SR1/NT/W-CIVIL/DOM/B00/25/13284 / WC 4393 Construction of parallel cable trench in 765kV yard at 765 400kV Raichur Substation | Sat, 18-Oct-2025 03:00 PM / Mon, 20-Oct-2025 03:30 PM
| Fri, 03-Oct-2025 03:00 PM |
View
| |
44
| Northern Region-I and Western Region-I | NR3/NT/G-CABLE/DOM/CP1/25/13095 / Supply of Power and Control Cables to Northern Region-I and Western Region-I of POWERGRID | Fri, 24-Oct-2025 11:00 AM / Fri, 24-Oct-2025 11:30 AM
| Fri, 03-Oct-2025 10:30 AM |
View
| |
45
| POWERGRID CORPORATION OF INDIA LTD., KOZHIKODE 400kV/220kV SUBSTATION, AREEKODE, ERNAD SUBDISTRICT MALAPPURAM DISTRICT | SR2/NT/W-AIS/DOM/C00/25/12679 / Augmentation of transformation capacity at 400/220kV Kozhikode S/s(WC-4542) | Fri, 31-Oct-2025 11:00 AM / Fri, 31-Oct-2025 11:30 AM
| Wed, 01-Oct-2025 04:47 PM |
View
| |
46
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13124 / Procurement of 2 Nos. 2 Ton Split ACs for Aurangabad Telecom Room through GeM | Sat, 11-Oct-2025 04:00 PM / Sat, 11-Oct-2025 04:30 PM
| Wed, 01-Oct-2025 03:50 PM |
View
| |
47
| Trivandrum, Kerala | SR2/NT/W-AIS/DOM/C00/25/10874 / AUGMENTATION OF TRANSFORMATION CAPACITY AT 400/220KV TRIVANDRUM S/S BY 1X500 MVA ICT (4TH) | Thu, 30-Oct-2025 11:00 AM / Thu, 30-Oct-2025 11:30 AM
| Wed, 01-Oct-2025 03:35 PM |
View
| |
48
| J&K | NR1/NT/S-MISC/DOM/ZA2/25/12540 / PROCUREMENT OF Leased bandwidth/NLD Links between POWERGRID office RHQ Jammu and Pang Ladakh | Mon, 13-Oct-2025 12:00 PM / Mon, 13-Oct-2025 12:30 PM
| Wed, 01-Oct-2025 02:35 PM |
View
| |
49
| Udumalpet | SR2/NT/W-CIVIL/DOM/C00/25/12668 / AUGMENTATION / REPLACEMENT OF EXISTING 400/230KV, 315 MVA ICT-2 WITH 400/230KV 500MVA ICT AT UDUMALPET 400/230V SUBSTATION | Fri, 24-Oct-2025 11:00 AM / Mon, 27-Oct-2025 11:30 AM
| Wed, 01-Oct-2025 03:00 PM |
View
| |
50
| Davanagere, Bellary | CC/T/W-AIS/DOM/A06/25/12830 / 765kV AIS Extn Substation Package SS 135T | Sun, 26-Oct-2025 11:55 PM / Tue, 28-Oct-2025 11:30 AM
| Tue, 30-Sep-2025 08:00 PM |
View
| |
51
| RHQ, Secunderabad | SR1/NT/W-CIVIL/DOM/B00/25/13222 / WC 4382 Renovation of VIP wing of Transit Camp in RHQ Building POWERGRID Secunderabad | Wed, 15-Oct-2025 03:00 PM / Wed, 15-Oct-2025 03:30 PM
| Tue, 30-Sep-2025 05:45 PM |
View
| |
52
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13212 / Dark fiber leasing (Main Path)from Ctrl-S Building 6 and 7 to PowerTel Chamber NTT Mahape for the period of Three years | Wed, 15-Oct-2025 03:00 PM / Wed, 15-Oct-2025 03:30 PM
| Tue, 30-Sep-2025 05:00 PM |
View
| |
53
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13211 / Dark fiber leasing (Protection Path)from Ctrl-S Building 6 and 7 to PowerTel Chamber NTT Mahape for the period of Three years | Wed, 15-Oct-2025 03:00 PM / Wed, 15-Oct-2025 03:30 PM
| Tue, 30-Sep-2025 04:45 PM |
View
| |
54
| Andhra Pradesh, Telangana | SR1/T/W-MISC/DOM/B00/25/13013 / Wc-4385-H-Route alignment and Detail survey activities for 765kV DC Kurnool-V to Shadnagar TL Line length 240 Kms | Wed, 15-Oct-2025 11:00 AM / Wed, 15-Oct-2025 11:30 AM (Corrigendum Id: 35857) | Tue, 30-Sep-2025 04:45 PM |
View
| 35857 dated Thu, 09-Oct-2025 09:50 AM
|
55
| Andhra Pradesh | SR1/T/W-MISC/DOM/B00/25/13012 / WC-4385-G-Route alignment and Detail survey activities for 765kV DC Kurnool-V to Sagar TL Line length 240 Kms plus 400kV DC Sagar to Nagarjunasagar TL Line length 25 Kms Total line length 265 Kms | Wed, 15-Oct-2025 11:00 AM / Wed, 15-Oct-2025 11:30 AM (Corrigendum Id: 35856) | Tue, 30-Sep-2025 04:45 PM |
View
| 35856 dated Thu, 09-Oct-2025 09:50 AM
|
56
| Mumbai | WR1/NT/S-MISC/DOM/ZA3/25/13184 / Underground dark fiber leasing from MSEB, Kalwa to Vodafone dighe for the period of Three years | Wed, 15-Oct-2025 12:00 PM / Wed, 15-Oct-2025 12:30 PM
| Tue, 30-Sep-2025 12:15 PM |
View
| |
57
| Raipur | WR1/NT/S-MISC/DOM/ZA3/25/13185 / Dark fiber leasing between Medical College to EPFO for Three Years | Wed, 15-Oct-2025 12:00 PM / Wed, 15-Oct-2025 12:30 PM
| Tue, 30-Sep-2025 12:10 PM |
View
| |
58
| 765/400 kV Dharamjaigarh substation | WR1/NT/W-MISC/DOM/F01/25/11621 / Existing community center expansion work at 765/400 kV Dharamjaigarh substation | Tue, 28-Oct-2025 05:00 PM / Sat, 11-Oct-2025 03:30 PM
| Mon, 29-Sep-2025 03:10 PM |
View
| |
59
| Meerut Substation | NR1/NT/W-CIVIL/DOM/I00/25/12403 / Repair and maintenance of switchyard roads, road shoulder and replacement of damaged cable trench cover slabs at Meerut Substation | Tue, 21-Oct-2025 11:00 AM / Thu, 23-Oct-2025 11:30 AM
| Sat, 27-Sep-2025 02:19 PM |
View
| |
60
| 765/400/220 KV GIS Meerut Substation | NR1/T/W-CIVIL/DOM/I00/25/12435 / Open TL Store construction with fencing at 765/400/220 KV GIS Meerut Substation | Fri, 17-Oct-2025 11:00 AM / Tue, 21-Oct-2025 11:30 AM
| Sat, 27-Sep-2025 02:12 PM |
View
| |
61
| DELHI | NR1/NT/G-COND/DOM/I00/25/12963 / Supply of Conductor, Earth wire, OPGW along with accessories and Hardware fitting for diversion of 400kV transmission lines of POWERGRID and DTL due to infringement with upcoming waste to energy facility of Municipal Corporation of Delhi | Thu, 16-Oct-2025 11:00 AM / Thu, 16-Oct-2025 11:30 AM
| Sat, 27-Sep-2025 02:04 PM |
View
| |
62
| Kalamb | CC/T/W-AIS/DOM/A04/25/12909 / 765kV AIS Extn. Substation Package SS 134T | Wed, 22-Oct-2025 11:55 PM / Fri, 24-Oct-2025 11:30 AM
| Fri, 26-Sep-2025 08:00 PM |
View
| |